[Singer A]
[Intro - spoken]
New input received.
Retention matters.
Capacity matters.
Administrative load matters.
Scarce professionals should not be wasted.
Please apply model consistently.
You said the people that we keep
Matter just as much somehow
As all the people we can find
To fill the vacancies right now
You said if systems overload
We wind up where we were before
So reduce the drag, protect the time
And keep the good work moving forward
Put the limits in the model
Put the workload in the tree
If capacity is measurable
Run the solver on me
Run the solver on me
Finite human capacity
Bound the hours, clear the ownership
Show me who holds authority
Run the solver on me
Don’t optimize past feasibility
If retention is the strategy
Run the solver on me
[Singer B]
[Banjo warning riff]
(Soft banjo lull, river hum, breathe in, breathe out)
[Verse 1]
Clocked out, boots off, by the shoreline glow,
Paper cuts fading where the cool waves flow.
All-day grind was heavy, but I won’t implode,
Let the ripples smooth out every overload.
Stress on the ledger, but I ease my chest,
Turn the checklist into space for rest.
From the shop floor buzz to the crickets’ song,
I’m learning how to stay here, even when it’s long.
[Pre-Chorus]
We name the weight so it don’t take hold,
Lay it on the current like a skipping stone.
We breathe through the stories that we once confessed,
Turn the battle plan into a wellness quest.
[Chorus]
Wasi River rest, let the worries drift away,
Not in anger, but in light at the end of the day.
We got hazards, controls, and banjo rolls in time,
But tonight we heal the heart, let the soft bells chime.
We don’t bury the signal in the noise we’ve known,
We just hum with the water in a gentle tone.
Wasi River rest, where the wild thoughts calm,
Every tired worker finds a quiet psalm.
[Singer A]
[Breakdown]
What’s the objective?
Retention.
What’s the constraint?
Capacity.
What’s the mitigation?
Reduce avoidable load.
And if somebody already told you?
Recalculate.
You can recruit another operator
You can rent another crew
You can move the work from here to there
And call the model new
You can redraw every org chart
Move the boxes carefully
But shifting where the workload lands
Doesn’t prove feasibility
If institutional memory
Has a replacement lead-time fee
Put that number in the model
Run the solver on me
Run the solver on me
Take the words literally
Limits, workload, human factors
Retention and sustainability
Run the solver on me
Same equations, different team
If the people that you keep still matter
Show your work and let me see
Run the solver on me
You already wrote the assumptions
Run the solver.
Run it clean.
Run the solver on me.
[Singer B]
[Outro]
(Soft banjo fade, low fiddle sigh)
River breathing slow while the night slips by.
One last chord on the shoreline crest,
Wasi River rest, Wasi River rest.